Abstract: Introduce of Hawassa industrial park project, which adopts intelligent power meters to collect various electrical parameters and switch signals at the distribution site. The system adopts the method of on-site networking. After networking, it communicates through the field bus and transmits it to the background. The power management system realizes real-time monitoring and management of the power consumption of the substation.

0 概述Overview

阿瓦萨工业园区位于非州埃塞俄比亚。

本项目现场10KV配电室AH1~AH14柜内的微机保护、电能表等,监测其供配电系统在运行过程中的实时电参量等数据。

Hawassa Industrial Park is located in Ethiopia, Africa。

The protection device, electric energy meter, etc. in the AH1~AH14 cabinets of the 10KV power distribution room at the project site monitor the real-time electrical parameters and other data of the power supply and distribution system during operation.

1 需求分析Demand analysis

解决方案:

1)10kV/35kV变电站综合自动化系统;

2)配网开关站智能监控后台系统;

3)用电需求侧协调控制平台。

solution:

1) 10kV/35kV substation integrated automation system;

2) Intelligent monitoring background system of distribution network switch station;

摘要:介绍埃塞俄比亚阿瓦萨工业园区项目,采用智能电力仪表、采集配电现场的各种电参量和开关信号。系统采用现场就地组网的方式,组网后通过现场总线通讯并远传至后台,通过电力管理系统实现变电所用电的实时监控和管理。

Abstract: Introduce of Hawassa industrial park project, which adopts intelligent power meters to collect various electrical parameters and switch signals at the distribution site. The system adopts the method of on-site networking. After networking, it communicates through the field bus and transmits it to the background. The power management system realizes real-time monitoring and management of the power consumption of the substation.

0 概述Overview

阿瓦萨工业园区位于非州埃塞俄比亚。

本项目现场10KV配电室AH1~AH14柜内的微机保护、电能表等,监测其供配电系统在运行过程中的实时电参量等数据。

Hawassa Industrial Park is located in Ethiopia, Africa。

The protection device, electric energy meter, etc. in the AH1~AH14 cabinets of the 10KV power distribution room at the project site monitor the real-time electrical parameters and other data of the power supply and distribution system during operation.

1 需求分析Demand analysis

解决方案:

1)10kV/35kV变电站综合自动化系统;

2)配网开关站智能监控后台系统;

3)用电需求侧协调控制平台。

solution:

1) 10kV/35kV substation integrated automation system;

2) Intelligent monitoring background system of distribution network switch station;